Construction consists of a sequence of refined steps.

Projects





Jaguar Land Rover
Halewood

 
Installing Industrial High Bay HPS light fittings, Canalis buss bar installation, internal and 1000m Fiber and 150m external SWA pulls. Expert scaffold building to seven metre working platform height using tower access system, due to the floor plant and equipment this required over 20+ builds. 





LFC Main Stand
Anfield

Turnstile and Exit system installation linking three levels and interconnecting with the existing ground security controls, handling the ingress/egress of over 8,000 people. The entire software and hardware controls where updated and final testing was completed without problems and on schedule. I was involved from the beginning of the job to final commissioning, working hard with the Tate team to fulfil a tight schedule. 





Orleans House
Liverpool

Orleans House, Edmund Street, Liverpool - Ex commercial office building under preservation order, conversion to a collection of 71 studio, one, two and three bedroom luxury apartments in a historic converted cotton warehouse. Switch control and distribution room design, working from drawings to install supply and feeds for individual properties. The switch room space was very limited requiring modifications to the existing plan supplied by the contractor.





St John bosco
Arts College

 
City & Guilds      NVQ3    2356
City & Guilds      L3            2391
City & Guilds      L2&3       2330
City & Guilds      L3            2381
City & Guilds      L3            2382
IPAF License       3a & 3b
PASMA                U





Liverpool Guild of Students
Mountford Hall 

Installed cabling, flown/fixed lighting trussing and AV systems over three venues run by the Liverpool Guild of Students (LGoS) as part of a major £14 million refurbishment and upgrade project spearheaded by the University of Liverpool. The project had a tight schedule requiring seven day weeks and long hours to get the job done.





The Gaiety Theatre
Isle of Man

Anchored safety ropes where required to install cabling from the control room supplying high level cantilevered speakers inside the proscenium arch.

Installed upgraded equipment and additional long multicore signal cable runs from the control room rack to the FOH mixer. Additional 16 A 230v power outlets where also installed  and the legacy equipment was serviced and repaired before commisioning





The Velodrome NCT
Manchester

Full Coda Line array system install - tight scheduling and time scales that had to be rigorously adhered to. ISG Region health and safety representatives were on site for the duration that Adlibs engineers were working and delays to the project were not tolerable





Liverpool Guild of Students
Mountford Hall 

Installed cabling, flown/fixed lighting trussing and AV systems over three venues run by the Liverpool Guild of Students (LGoS) as part of a major £14 million refurbishment and upgrade project spearheaded by the University of Liverpool. The project had a tight schedule requiring seven day weeks and long hours to get the job done.





The Gaiety Theatre
Isle of Man

Installed upgraded cabling and additional speaker cables to supply high level speakers

rope access safety rigging